A finished court that drains after every storm, holds its surface for years, and is ready to play year-round.
On-Site Evaluation
Itemised Estimate
Final Walkthrough
Backyard to Commercial
What Goes Wrong
The decisions made in the first week determine how the court performs for the next decade
Skipping or rushing the base stage is the single most common reason courts crack, pool water, or need early resurfacing.
Uncompacted Sub-Base
A sub-base laid without proper compaction testing develops low spots that crack the slab within a few seasons, no matter how thick the coating is.
Compaction Before Pour
Soil stability is confirmed on-site before any base material is ordered, so the slab has a consistent foundation across the full court footprint.
Drainage as Afterthought
Drainage channels added after the slab is poured rarely integrate cleanly, leaving water pooling at the baseline after South Florida’s heavy summer storms.
Drainage at Base Stage
Perimeter run-off clearance and drainage slope are engineered into the base layer, not retrofitted once the surface is already down.
Coating Applied Too Soon
Acrylic applied before the slab reaches full cure traps moisture underneath, causing bubbling, delamination, and premature surface wear.
Cure Interval Respected
The base layer is allowed to reach full cure before any acrylic color coating is applied, so the surface bonds correctly and holds its texture.
UV-Unstable Surface
Standard acrylic coatings fade and lose texture quickly under Fort Lauderdale’s intense sun, leaving a slick, uneven surface that needs resurfacing far ahead of schedule.
UV-Stable Acrylic Coating
UV-stable acrylic holds color and surface grip through South Florida’s heat and resists the thermal expansion that causes premature cracking.
Each component below is listed as a separate line item in the written estimate, so you see exactly what is being built and why.
Site Grading & Base Preparation
Excavation, fill work, and sub-base compaction establish the drainage slope and stable foundation the slab needs to last.
Concrete Slab or Asphalt Sub-Base
The structural base layer is poured and cured to full strength before any surface coating is applied, preventing delamination.
Drainage System Integration
Perimeter channels and run-off clearance are built into the base stage to handle South Florida’s heavy seasonal rainfall without pooling.
Acrylic Surface Coating
UV-stable acrylic color coating is applied in multiple passes to deliver consistent surface texture and grip across the full playing area.
Regulation Line Striping
Court lines are marked to regulation dimensions and confirmed for accuracy during the final walkthrough before the job is signed off.
Net Posts & Perimeter Fencing
Net posts are set in concrete footings at the correct centerline, and perimeter fencing is installed with post footings coordinated to the court layout.
Backyard Residential Courts
Full builds on Fort Lauderdale residential lots of varying size.
HOA & Community Courts
Multi-court layouts for shared recreation spaces.
School & Commercial Courts
Campus and club builds with commercial-grade fencing.
Resurfacing & Repair
Worn or cracked courts restored to a playable surface.
Full Tennis Court Builds
A tennis court that drains correctly and holds its surface for years
South Florida’s heat and heavy rain make base preparation and drainage integration the two decisions that determine how long a court lasts.
Installation begins with site grading to establish a consistent drainage slope across the full court footprint. Fort Lauderdale residential lots vary widely in existing grade, so excavation and fill work are confirmed on-site before any base material is ordered. A court built on an uneven or poorly compacted sub-base will develop low spots and surface cracking within a few seasons, regardless of how good the coating is.
The base layer, concrete slab or asphalt sub-base, is poured and allowed to reach full cure before the acrylic surface coating is applied. UV-stable acrylic holds color and surface texture through Fort Lauderdale’s intense sun exposure and resists the thermal expansion that causes premature cracking. Drainage channels or perimeter run-off clearance are integrated at the base stage, not added as an afterthought.
Acrylic color coating and regulation line striping are applied after the surface cures. Net posts are set in concrete footings at the correct centerline position, and perimeter fencing is installed with post footings coordinated to the court layout. A final walkthrough confirms line marking accuracy, surface finish, and that drainage runs clear from the baseline to the perimeter before the crew leaves the site.
Why Choose Us
Why Fort Lauderdale Sports Courts for tennis court installation?
Every build starts with an on-site evaluation and ends with a signed-off walkthrough, nothing is left to assumption.
Written Estimate Before Any Work Starts
Base prep, surfacing, fencing, and line marking are listed as separate line items so you know exactly what is being built.
On-Site Drainage Assessment First
Grade and drainage direction are evaluated in person before scope is set, so the drainage plan fits the actual site.
Final Walkthrough on Every Build
Surface finish, line accuracy, and drainage flow are all confirmed before the job is signed off and the crew leaves.
Residential & Commercial Scope
Backyard, HOA, school, and commercial courts are all covered under the same evaluation and estimate process.
Resurfacing Available for Worn Courts
If an existing court needs repair or resurfacing, that work is available without needing a full rebuild.
Fort Lauderdale Area Coverage
Builds and repairs are arranged across Fort Lauderdale, Weston, Parkland, Davie, Southwest Ranches, and Coral Springs.
Questions about tennis court installation in Fort Lauderdale
How much does it cost to install a tennis court?
Most residential tennis court installations come in at $45,000-$80,000, depending on surface type, base preparation, fencing, and lighting. Asphalt bases with acrylic coating sit at the lower end; post-tension concrete or cushioned surfaces push costs higher. An on-site evaluation produces an itemised written estimate so you know exactly what each line item covers.
What usually changes the cost of a tennis court installation?
The four biggest cost drivers are base material, surface type, drainage work, and fencing. A site that needs significant grading or subsurface drainage adds to base preparation costs. Adding lighting, windscreens, or a cushioned acrylic surface each adds a separate line item. An itemised estimate breaks all of this out before any work begins.
What is the cheapest way to build a tennis court?
An asphalt base with a standard acrylic coating is the lowest-cost route for a full-size court. Skipping lighting and using chain-link rather than powder-coated steel fencing also reduces the total. Going cheaper on base thickness or drainage, however, leads to cracking and pooling within a few years, which costs more to fix than the original saving.
Will a tennis court fit in my yard?
A regulation singles court needs a minimum cleared area of roughly 60 by 120 feet; a doubles court needs about 60 by 120 feet of playable surface plus run-off space, totalling closer to 7,200 square feet. An on-site evaluation confirms whether your yard can accommodate the court and any required setbacks or drainage buffers.
How much space do I need for a tennis court?
A regulation doubles court measures 36 by 78 feet, but you need run-off clearance on all sides. The recommended total footprint is approximately 60 by 120 feet, or about 7,200 square feet. Tighter lots may still work if setbacks allow, which an on-site evaluation can confirm.
Do I need special measurements for a tennis court?
Yes. USTA standards set the court at 78 feet long and 36 feet wide for doubles, with specific net-post positions and service-box dimensions. Line marking must match those specs for the court to play correctly. The site evaluation and design phase confirms all measurements before base preparation begins.
How long does a tennis court last before major repairs?
A well-built asphalt court with proper drainage typically goes 8 to 12 years before needing resurfacing. Post-tension concrete can last longer between major repairs. Courts built on poorly compacted bases or with inadequate drainage fail much sooner, often cracking within 3 to 5 years. Base quality at installation is the single biggest factor in long-term durability.
Does a tennis court add value to a property?
A well-built tennis court adds measurable appeal on larger lots, particularly in neighborhoods where outdoor amenities are expected. The value uplift varies by local market and lot size. On smaller lots, buyers sometimes view a court as reducing usable yard space, so location and lot size both matter when weighing the decision.