A court sized, drained, and surfaced for your yard, ready for year-round play in South Florida’s climate.
On-Site Evaluation First
Itemised Written Estimate
Final Walkthrough Included
Resurfacing Available
What Goes Wrong
The details that separate a court that lasts from one that doesn’t
Skipping steps in base prep or drainage is where most backyard court problems start.
Inadequate Drainage
A court built without a proper drainage slope will pool after every summer storm, making the surface slippery and accelerating surface wear.
Graded Sub-Base First
We arrange grading and drainage slope confirmation before any surface goes down, so water clears the court instead of sitting on it.
Wrong Surface Choice
Modular tiles installed over a cracked or uneven slab flex and separate; poured surfaces laid without a compacted base crack under South Florida heat cycles.
Surface Matched to Base
The surface type is chosen after the base condition is assessed on-site, so the two work together rather than against each other.
Add-Ons Bolted On Late
Hoops, lighting, and fencing added after the court is finished often require cutting into the surface for post footings and conduit runs.
Add-Ons Scoped Upfront
Post footings and conduit runs are coordinated with the court layout from the start, so nothing is cut into a finished surface later.
Layout Too Small
A court laid out without measuring the usable yard area often ends up too short for real play, with no room for out-of-bounds clearance.
Dimensions Confirmed First
The on-site evaluation confirms usable dimensions and recommends a half-court, full-court, or multi-sport layout that actually fits the space.
Fort Lauderdale residential lots are often compact, so the first step is an on-site evaluation to confirm usable dimensions and drainage direction. Many yards suit a half-court or multi-sport layout better than a full-size single-sport court. That assessment shapes every decision that follows.
Surface choice comes next. Modular sport court tiles install over an existing concrete slab and handle South Florida’s heat cycles without cracking. A poured concrete or asphalt base with acrylic color coating gives a more traditional feel and a harder rebound. Both options require a properly graded sub-base to prevent pooling after summer storms.
Add-ons like basketball hoops, perimeter fencing, and LED court lighting are scoped during the same visit so post footings and conduit runs are coordinated with the court layout from the start. A final walkthrough before the crew leaves confirms surface finish, line marking, and drainage clearance.
Why Choose Us
Why Fort Lauderdale Sports Courts for your backyard build
Accountability and process built around the residential backyard context, not a scaled-down version of a commercial job.
Written Estimate Before Any Work Is Booked
Base prep, surfacing, fencing, and line marking are listed as separate line items so you know exactly what you are approving.
On-Site Evaluation on Every Job
We arrange a local court builder to assess drainage and usable dimensions before a single material is ordered.
South Florida Drainage Knowledge
Broward County’s high water table and summer-storm rainfall are factored into every grading and sub-base recommendation.
Add-Ons Coordinated from Day One
Hoops, lighting, and fencing are scoped at the evaluation so nothing is retrofitted into a finished surface.
Final Walkthrough Before Sign-Off
Surface finish, line marking, and drainage clearance are confirmed on-site before the job is considered complete.
Resurfacing & Repair Available
Worn courts can be assessed and restored without a full rebuild, covered under the same evaluation and estimate process.
How It Works
From first enquiry to finished court in three steps
Questions homeowners ask before building a backyard court
How much does it cost to build a backyard sports court?
Most backyard sports courts come in at $5,500-$9,500, depending on size, surface type, base preparation, and any add-ons like fencing or lighting. An on-site evaluation and itemised written estimate are provided before any work begins, so you know exactly what each line item covers.
Will the court work in a small backyard or side yard?
Yes, provided the space meets the minimum footprint for the sport you want. A half-court basketball setup or a pickleball court can fit in tighter spaces than a full tennis court. An on-site evaluation confirms whether your specific dimensions work and which layout makes the best use of the available area.
What size court fits in my backyard?
A standard pickleball court needs roughly 30 by 60 feet with buffer space; a half-court basketball setup can work in about 30 by 25 feet; a full tennis court requires around 60 by 120 feet. An on-site evaluation maps your actual dimensions and recommends the largest court that fits safely within your yard.
Is a backyard basketball court worth it for my family?
For families who play regularly, a dedicated court removes the need to travel to public courts and gives kids a safe, consistent surface at home. A properly built court on a prepared base holds up for many years with minimal upkeep, spreading the cost over a long useful life compared with recurring facility fees.
Should I choose sport court tiles or a poured surface?
Modular tiles install faster, allow individual tile replacement if one section is damaged, and have some built-in flex underfoot. Poured acrylic or asphalt surfaces offer a seamless playing area with a more traditional feel and are generally lower profile. The right choice depends on your budget, intended sport, and how the base is prepared.
What kind of site prep is needed before the court can go in?
Site prep typically covers clearing vegetation, grading the area to a consistent slope for drainage, compacting the sub-base, and pouring or laying the base layer. The exact scope depends on what the on-site evaluation finds. See Court Design & Site Preparation for a full breakdown of what each stage involves.
Will you need to level or grade my yard first?
Almost always, yes. Even a yard that looks flat usually has enough slope variation to cause drainage problems or an uneven playing surface without grading. The on-site evaluation measures existing grade and identifies how much earthwork is needed before the base can be laid correctly.
Will the surface hold up in Florida rain and drainage conditions?
Yes, when the base is graded correctly. Courts are built with a slight slope, typically 1 percent, so water sheets off the surface rather than pooling. In South Florida’s heavy summer rain, that base grading is the critical factor; a properly prepared court drains quickly and returns to playable condition within minutes of a storm.