Court Design & Site Preparation in Fort Lauderdale

A court that stays level and drains cleanly starts with ground that was graded, compacted, and confirmed before any surface work begins.

  • On-Site Evaluation
  • Written Estimate
  • Final Walkthrough
  • Backyard to Commercial
Prepared sports court site with graded compacted aggregate base and drainage channels ready for surface installation.

What Goes Wrong

Why rushed site prep causes courts to fail early

The failure modes that shorten a court’s life are almost always set in motion before the surface is ever laid.

Skipped Compaction

A sub-base that was not compacted in layers loses density under load, creating low spots and surface cracks within the first few years.

Layered Compaction

Fill material and stone aggregate are compacted in staged lifts to meet the load-bearing standard the surface requires.

No Drainage Slope

A flat or inward-sloping court traps rainwater, softening the base and accelerating surface deterioration through Fort Lauderdale’s wet season.

Graded Drainage Slope

The full court footprint is graded to a consistent slope so water moves away from the playing area after every storm.

Unmarked Utilities

Excavating without locating irrigation lines and electrical conduit first risks costly damage and delays that push the whole build back.

Utility Marking First

Utility and irrigation lines are confirmed on the surface before any excavation begins, keeping the schedule and the budget intact.

Soft or Sandy Soil

South Florida’s sandy soils shift under a court slab when the sub-base is not stabilized, causing uneven settling across the playing surface.

Sub-Base Stabilization

Soft or sandy soil is excavated and replaced with compacted fill and stone aggregate that holds its position under the finished court.

Common problems, answered

How the Work Is Done

Why the ground work determines how long your court lasts

A court that stays level and drains cleanly is built on a sub-base that was graded and compacted correctly before the surface went down.

Site preparation starts with measurement and utility marking. Fort Lauderdale properties commonly have irrigation lines and electrical conduit close to the surface, and striking either during excavation adds cost and delay. Once utilities are confirmed, clearing and excavation remove roots, debris, and soft soil that would cause settling under load.

Grading follows, establishing a consistent drainage slope across the full court footprint. South Florida soils can be sandy or soft, so fill material and stone aggregate are compacted in layers to meet the load-bearing standard the surface requires. Skipping or rushing compaction is the most common reason courts develop low spots and cracking within the first few years.

Corner layout is verified after compaction, confirming the court sits square and at the correct elevation before any surface work is scheduled. Retaining walls or turn-down beams are added where the grade change at the court edge needs structural support. Nothing moves forward until the sub-base passes a stability check.

Why Choose Us

Why Fort Lauderdale Sports Courts for site preparation?

Site prep is where the long-term outcome is decided, here is what we put in place to protect yours.

Evaluation Before Any Commitment

We arrange an on-site evaluation of the space and drainage before any work is scheduled or deposit is taken.

Itemised Written Estimate

The estimate lists base preparation, surfacing, fencing, and line marking as separate line items so nothing is hidden.

Drainage Assessed on the Day

The site visit includes a drainage assessment so grading decisions are based on the actual ground, not assumptions.

Final Walkthrough Sign-Off

No job is closed until a final walkthrough confirms the sub-base and layout meet the agreed specification.

Backyard to Commercial Scope

We arrange site prep for residential backyards, HOA courts, schools, and commercial properties across Broward County.

A completed sports court builder job at a house
A finished sports court builder project

The Process

From first call to a confirmed sub-base

  1. 01

    Request an Evaluation

    Tell us the site location and the sport, and we arrange an on-site visit to assess drainage, soil, and utility positions.

  2. 02

    Review Your Estimate

    We provide an itemised written estimate covering clearing, excavation, grading, compaction, and corner layout confirmation.

  3. 03

    Confirm the Sub-Base

    Work proceeds through each stage, ending with a stability check and final walkthrough before surface work is scheduled.

Pricing Estimates

Typical Court Design & Site Preparation Prices

JobTypical cost
Court layout and design$1,500-$5,000
Site clearing and grading$3,000-$12,000
Drainage and base preparation$8,000-$25,000
These prices are estimates and often vary with the condition, size and scope of each job. Message or call us for a free, no-obligation quote.
See all prices

Common Questions

Questions about court site preparation in Fort Lauderdale

Why does my court site need grading before the build?

An ungraded site creates low spots where water pools under the surface, which undermines the base and causes cracking or heaving over time. Grading establishes a consistent slope, typically 1 percent, so water sheds away from the court rather than sitting beneath it. Without it, even a well-built surface will fail prematurely.

Do drainage problems really matter for a backyard court?

Yes, poor drainage is the most common cause of court surface failure. Standing water softens the compacted base, which leads to cracking, surface bubbling, and uneven play areas. In South Florida’s heavy rain season, a court built on a lot without proper water management can show damage within the first year.

Can the court just be put on my existing yard as is?

Almost never. Existing yard surfaces have organic topsoil, grass, and uneven grade, none of which can support a stable court base. The area needs to be cleared, excavated to the correct depth, filled with compactable material, and graded before any surface goes down. Skipping prep leads to a surface that shifts and cracks within a few seasons.

Is my yard suitable for a sports court, or does it need prep first?

Every yard needs some level of preparation, the question is how much. An on-site evaluation checks slope, soil type, drainage, and available dimensions to determine what prep is required. Some lots need only minor grading; others with poor soil or significant slope require more extensive base work before construction can begin.

How do you make sure the court will drain properly, not just look level?

The base is graded to a precise cross-slope so water moves off the surface in a controlled direction rather than pooling. On lots with poor natural drainage, French drains or perimeter channels are added to carry runoff away from the base. The on-site evaluation identifies which drainage approach the specific lot requires before any work begins.

What happens during site preparation for a sports court?

Prep starts with clearing vegetation and topsoil, then excavating to the required depth. The sub-base is filled with compactable aggregate, graded to the correct slope, and compacted in layers to meet load-bearing requirements. Drainage features are installed at this stage. The finished base is inspected before surfacing begins.

Will excavation damage my irrigation lines or utilities?

Utility lines are located before any digging starts, Florida law requires calling 811 to mark underground lines prior to excavation. Irrigation lines within the work zone are identified during the on-site evaluation so they can be capped, rerouted, or protected. Flagging these in advance is standard practice, not an afterthought.

Do you handle clearing, fill, and compaction as part of the prep work?

Yes, clearing, fill, and compaction are all part of site preparation. The itemised written estimate you receive after the on-site evaluation breaks out each element so you can see exactly what the prep scope covers and what it costs before any work begins.